CYSF-8 Self-Closing Valve
1 / 3
The CYSF-8 is a self-closing cylinder valve for liquefied petroleum gas (LPG) service.
The self-closing valve and separately specified cylinder and outlet interfaces identify this LPG configuration. Check the connection and material specifications against your installation requirements.
Key advantages
- LPG service — A cylinder-valve configuration for liquefied petroleum gas (LPG) service.
- Self-closing construction — A self-closing valve configuration for the stated cylinder service.
- Separate connection references — Defined inlet and outlet references support checking both sides of the installation.
Print / Save PDF — no form required.
Specifications
| Parameter | Value |
|---|---|
| Applicable medium | Liquefied petroleum gas (LPG) |
| Working pressure | 2.1 MPa |
| Gas-tightness test pressure | 2.1 MPa |
| Proof test pressure | 10.5 MPa |
| Safety device | 2.8 MPa Reseating: 2.6 MPa |
| Cylinder / inlet connection | PZ27.8 |
| Outlet connection | φ28 |
| Valve structure | Self-closing |
| Body material | HPb59-1 |
| Seal material | NBR |
| Stem material | HPb59-1 |
| Handwheel material | No handwheel |
| Temperature range | -40 °C to 55 °C |
| Manufacturing standard / reference | Reference: UL 1769 |
| Overall height | ≈85 mm |
| Width / diameter | φ41 mm |
| Net weight | 380 g |
Technical Illustration
For reference. Not to scale.
Product Configurator
| Model | Gas | Working pressure | Operation / structure | Inlet | Outlet |
|---|---|---|---|---|---|
| CYSF-8 | Liquefied petroleum gas (LPG) | 2.1 MPa | Self-closing | PZ27.8 | φ28 |
| Your request |
Special requirements are subject to technical confirmation. Your requests do not change the standard product specifications.
Company catalogue
No approved company catalogue is currently available. You can request specific product documents through Technical Matching.
Need this product’s specifications? Print / Save PDF — no form required.
Connect with an Expert
Regarding: CYSF-8 · Liquefied petroleum gas (LPG) · 2.1 MPa
Our latest insights
Technical Article
Managing specification revisions during sourcing
Read more →Technical Article
Reading certification claims: scope and evidence
Read more →Technical Article
Working pressure, test pressure and other ratings: what to verify
Read more →Technical Article
Material and seal information to confirm with a supplier
Read more →Technical Article
Start with the application: building a valve requirements brief
Read more →Technical Article